Home > Method Statement

Method Statement

A method statement in construction is a detailed document that describes how a specific task or process will be carried out to ensure safety, efficiency, and quality. It outlines the steps, materials, equipment, and safety measures required to complete a job according to regulations and standards.

Excavation Method Statement

Purpose: Outlines steps to safely excavate soil for foundations, trenches, or other groundworks.

Key Elements:

Site preparation, including marking excavation areas.

Equipment used (e.g., backhoes, excavators) and safety checks.

Shoring or bracing details to prevent soil collapse.

Procedures for handling and disposing of excavated material.

Concrete Pouring Method Statement

Purpose: Details steps for pouring and curing concrete to achieve required strength and finish.

Key Elements:

Formwork installation, reinforcement placement, and inspection.

Concrete mix specification and transportation to the site.

Pouring techniques and vibration for compaction.

Curing methods and duration to prevent cracks and enhance strength.

Steel Structure Erection Method Statement

Purpose: Provides guidelines for safe assembly and erection of steel structures.

Key Elements:

Sequence of lifting, alignment, and connection of steel components.

Safety protocols, such as rigging methods, crane requirements, and load testing.

Welding or bolting methods for structural stability.

Inspection and verification of alignment and connections.

Masonry Work Method Statement

Purpose: Describes the process of laying bricks, blocks, or stones with quality and stability.

Key Elements:

Preparation of mortar mix and setting up materials.

Laying technique, including bond pattern, alignment, and jointing.

Procedures for reinforcing masonry if necessary.

Cleaning and finishing the surface once the wall reaches specified height.

Electrical Installation Method Statement

Purpose: Ensures safe and correct installation of electrical wiring, fixtures, and panels.

Key Elements:

Wiring layout, conduit installation, and cable selection.

Safety protocols for working with live circuits, grounding, and insulation.

Testing procedures to confirm circuit integrity.

Labeling and documentation for easy identification.

 Plumbing and Drainage Method Statement

Purpose: Provides guidelines for installing plumbing and drainage systems effectively.

Key Elements:

Routing and installation of water supply and drainage pipes.

Leak testing, especially in high-pressure systems.

Procedures for joining pipes, sealing joints, and using waterproofing.

Inspection protocols for compliance with plumbing codes.

Scaffolding Erection and Dismantling Method Statement

Purpose: Ensures the safe setup and removal of scaffolding structures.

Key Elements:

Types of scaffolding and materials to be used.

Sequence of assembling parts (frames, planks, guardrails) and securing anchors.

Safety checks, such as load capacity and stability tests.

Dismantling steps, ensuring minimal risk of falls or component damage.

Roofing Method Statement

Purpose: Outlines how roofing materials will be installed to ensure weatherproofing and durability.

Key Elements:

Surface preparation and underlayment installation.

Laying shingles, tiles, or sheets with overlap specifications.

Flashing installation to prevent leaks around edges and openings.

Procedures for inspection and repairs if any deficiencies are found.

Fire Protection System Installation Method Statement

Purpose: Details installation of fire safety systems, such as sprinklers or alarms.

Key Elements:

System layout based on building plans.

Connection of fire alarms, detectors, and suppression systems.

Testing and calibration to confirm functionality.

Documentation and safety procedures for periodic maintenance.

Interior Finishing Method Statement

Purpose: Covers processes for installing interior finishes like plastering, painting, and flooring.

Key Elements:

Preparation of surfaces for adhesion (e.g., cleaning, priming).

Application techniques for plaster, paint, or tile adhesives.

Curing times, especially for finishes requiring drying (e.g., tiles, plaster).

Final inspection to ensure finish meets design and aesthetic requirements.

Demolition Method Statement

Purpose: Ensures safe removal of structures or materials with minimal impact to surrounding areas.

Key Elements:

Identification of hazardous materials (e.g., asbestos) and removal procedures.

Sequence of demolition, including cutting, breaking, or lifting components.

Dust control, noise reduction, and debris handling procedures.

Disposal protocols for waste in accordance with environmental regulations.

Waterproofing Method Statement

Purpose: Guides application of waterproofing materials to protect against moisture infiltration.

Key Elements:

Surface preparation, cleaning, and priming.

Application method for waterproof membranes, coatings, or sealants.

Overlapping, joining, and sealing techniques to prevent leaks.

Curing time and inspection to ensure complete coverage.

Roadwork and Paving Method Statement

Purpose: Details steps for laying asphalt, concrete, or pavers in roads, sidewalks, or driveways.

Key Elements:

Grading and leveling for drainage.

Layering and compaction of base materials.

Laying asphalt or concrete with compaction techniques.

Finishing details like curbing, striping, and sealing for durability.

Lifting and Rigging Method Statement

Purpose: Ensures safe lifting of heavy materials or equipment on site.

Key Elements:

Rigging setup and crane specifications.

Load calculations and weight distribution checks.

Inspection of lifting gear and equipment prior to use.

Safety protocols for ground crew and emergency stop procedures.

Glazing Method Statement

Purpose: Details installation of glass panels, windows, or facades to ensure safety and aesthetics.

Key Elements:

Handling techniques for glass to avoid damage.

Fastening and sealing methods for airtight and watertight installations.

Safety measures, particularly for large or high-up glass panels.

Cleaning and inspection for scratches or defects.

Standard Structure of a Method Statement

A typical method statement follows a structured format to ensure clarity and coverage of all relevant aspects:


Scope of Work: Description of the task and its objectives.

Roles and Responsibilities: Identifies team members responsible for each stage.

Materials and Equipment: Lists materials, machinery, and tools required.

Step-by-Step Procedure: Detailed description of each task in sequential order.

Safety Measures and PPE Requirements: Lists hazards, PPE, and safety precautions.

Environmental Considerations: Procedures to minimize environmental impact.

Quality Control: Inspection and testing requirements to ensure compliance.

Emergency Procedures: Action plan for potential accidents or emergencies.